G-Rib Siding Pricing
Unit Cost is your raw cost. Extra Labor is added per-unit labor. Markup % is applied to (Unit Cost + Extra Labor) to get the final Unit Price.
| Item | Unit | Unit Cost | Extra Labor | Markup % | Unit Price (Computed) |
|---|
Cottage Panel is a premium variant of G-Rib. When a contractor selects the Cottage Panel upgrade, these upcharges are applied on top of G-Rib pricing. Both fields stack — set either or both.
| Upcharge Type | Description | Value |
|---|---|---|
| Percentage Upcharge | Applied to G-Rib material total when Cottage Panel is selected | % |
| Flat Upcharge per SQ | Added per net SQ when Cottage Panel is selected | $/SQ |
G-Rib siding has no profile markup or sealant upcharge. Add to Price is added after all markups.
Waste factors are shared across all siding products. Edit on Board & Batten pricing page to change for all products.
| Factor | Value | Applied To |
|---|---|---|
| Diff 1 — Easy | 1.04× | Siding panels, trim per-SQ |
| Diff 2 — Moderate | 1.075× | Siding panels, trim per-SQ |
| Diff 3 — Average | 1.10× | Siding panels, trim per-SQ |
| Diff 4 — Difficult | 1.13× | Siding panels, trim per-SQ |
| Diff 5 — Very Difficult | 1.15× | Siding panels, trim per-SQ |
| Trim Waste | 1.10× | All trim types |
G-Rib siding labor rates. Distance multipliers and tearoff are shared — edit on B&B page.
| Parameter | Description | Value |
|---|---|---|
| Base Labor Rate | Per wall SQ for G-Rib siding | $/SQ |
| Difficulty Step | Added per SQ per difficulty level above 1 | $/SQ |
| Height/Story Surcharge | Extra per SQ for each story above 1 | $/SQ per story |
| New Construction Discount | % labor discount when "New Construction" is checked | % |
G-Rib specific soffit and fascia pricing. Shared items can be overridden here.
| Item | Unit | Unit Cost | Extra Labor | Markup % | Unit Price |
|---|