Panel Install Labor By Product
Formula: Rate = Base Rate + (Diff Step × (Difficulty − 1)) + (Story Step × (Stories − 1))
Small jobs below the threshold get +1 difficulty automatically.
Trim Install Labor Per Linear Foot
Labor charges per linear foot for each trim type. Applied in addition to material costs.
Soffit & Fascia Install Labor Per Linear Foot
Install labor per linear foot for soffit and fascia options. These rates are the same across all siding products.
Labor Rate Preview Chart Auto-Calculated
Computed from the panel install rates above. Shows $/SQ for each product at each difficulty level and story count.
1-Story Rates
| Product | Diff 1 | Diff 2 | Diff 3 | Diff 4 | Diff 5 |
1.5-Story Rates
| Product | Diff 1 | Diff 2 | Diff 3 | Diff 4 | Diff 5 |
2-Story Rates
| Product | Diff 1 | Diff 2 | Diff 3 | Diff 4 | Diff 5 |
2.5-Story Rates
| Product | Diff 1 | Diff 2 | Diff 3 | Diff 4 | Diff 5 |
3-Story Rates
| Product | Diff 1 | Diff 2 | Diff 3 | Diff 4 | Diff 5 |
Saved!